WE WORK FOR THE BEST.
These clubs rely on heiler.
Selection of our current projects.
Signal Iduna Park
Borussia Dortmund
In a really short time, we converted the Signal Iduna Park from natural to artificial grass during summer 2016 in order to guarantee an optimal growth of the turf even within the short summer break.
We installed a special turf-bearing layer for hybrid turf and then implanted the heiler Sporthybrid R system. Following that, a customised seeding mixture was sown. We covered the entire area with turf blankets which stimulates a particularly rapid growth of the grass.
It was well worth the effort: the BVB greenkeeping team took first place at the Pitch Of The Year Award in the 2016/2017 season.
Holstein Kiel
Training Ground
FC Schalke 04
Training Centre
Bayer Leverkusen Stadium
BayArena
FC Bayern München Training
FC Bayern Campus
Borussia Dortmund Stadium
Signal Iduna Park
Borussia Dortmund Training
Training Centre
VfL Wolfsburg Stadium
Volkswagen Arena
DSC Arminia Bielefeld Stadium
Schüco Arena
Sportfreunde Lotte Stadium
FRIMO Stadion
FC Bayern Munich Stadium
Allianz Arena
1. FSV Mainz 05 Training
Training Centre
FC Augsburg Training
Hybrid Turf Pitch
Kieler SV Holstein Stadium
Holstein Stadion
1. FSV Mainz 05 Stadium
OPEL-Arena
VfL Wolfsburg Training
Hybrid Turf Pitch
1. FC Köln Training
Hybrid Turf Pitch
1. FC Cologne Stadium
Franz-Kremer-Stadion
Spvgg. Greuther Fürth Training
Training Centre