WE WORK FOR THE BEST.
These clubs rely on heiler.
Selection of our current projects.
RheinEnergieSTADION
1. FC Köln
During the 2026 summer break, heiler installed a hybrid turf system at the RheinEnergieSTADION for the first time on behalf of Kölner Sportstätten. The system significantly improves the durability of the pitch at the historic stadium in Cologne’s Müngersdorf district. The reinforcement increases both shear resistance and water permeability, enhancing overall pitch quality.
During the summer, the stadium regularly hosts concerts by national and international artists, making it necessary to replace the hybrid turf system afterwards. For this reason, a system with shorter synthetic fibres was installed. Measuring just 10 cm rather than 20 cm, the fibres allow renovation to be carried out with minimal effort.
Borussia Dortmund Training Centre
Training Centre
SV Werder Bremen Stadium
Weserstadion
1. FC Köln Stadium
RheinErnergieSTADION
1. FC Heidenheim Stadium
Voith-Arena
VfL Wolfsburg Stadium
Volkswagen-Arena
Borussia Dortmund Stadium
Signal Iduna Park
FC St. Pauli Stadium
Millerntorstadion
FC Bayern München Stadium
Alianz Arena
SC Verl Stadium
SPORTCLUB ARENA
RB Leipzig Stadium
Red Bull Arena
VfL Wolfsburg
Training Ground
Holstein Kiel
Training Ground
FC Schalke 04
Training Centre
Bayer Leverkusen Stadium
BayArena
FC Bayern München Training
FC Bayern Campus
Borussia Dortmund Stadium
Signal Iduna Park
VfL Wolfsburg Stadium
Volkswagen Arena
DSC Arminia Bielefeld Stadium
Schüco Arena
Sportfreunde Lotte Stadium
Stadion am Lotter Kreuz
FC Bayern Munich Stadium
Allianz Arena
1. FSV Mainz 05 Training
Training Centre
FC Augsburg Training
Hybrid Turf Pitch
Kieler SV Holstein Stadium
Holstein Stadion
1. FSV Mainz 05 Stadium
MEWA-Arena
VfL Wolfsburg Training
Hybrid Turf Pitch
1. FC Köln Training
Hybrid Turf Pitch
1. FC Cologne Stadium
Franz-Kremer-Stadion
Spvgg. Greuther Fürth Training
Training Centre