WE WORK FOR THE BEST.
These clubs rely on heiler.
Selection of our current projects.
Training centre
1. FSV Mainz 05
Within just one year the area around the former home ground of 1. FSV Mainz 05 was transformed into a modern training centre. The construction works at Bruchwegstadion started at the beginning of the year 2018. After tearing down the northern stand and the old training grounds, we created three pitches with natural turf – all of them are equipped with grass heating systems – as well as another training ground with the innovative heiler Sporthybrid Turf. In addition, the entire outside area was redesigned with a new stand, paths and ball catch fence amongst other features.
Borussia Dortmund Training Centre
Training Centre
SV Werder Bremen Stadium
Weserstadion
1. FC Köln Stadium
RheinErnergieSTADION
1. FC Heidenheim Stadium
Voith-Arena
VfL Wolfsburg Stadium
Volkswagen-Arena
Borussia Dortmund Stadium
Signal Iduna Park
FC St. Pauli Stadium
Millerntorstadion
FC Bayern München Stadium
Alianz Arena
SC Verl Stadium
SPORTCLUB ARENA
RB Leipzig Stadium
Red Bull Arena
VfL Wolfsburg
Training Ground
Holstein Kiel
Training Ground
FC Schalke 04
Training Centre
Bayer Leverkusen Stadium
BayArena
FC Bayern München Training
FC Bayern Campus
Borussia Dortmund Stadium
Signal Iduna Park
VfL Wolfsburg Stadium
Volkswagen Arena
DSC Arminia Bielefeld Stadium
Schüco Arena
Sportfreunde Lotte Stadium
Stadion am Lotter Kreuz
FC Bayern Munich Stadium
Allianz Arena
1. FSV Mainz 05 Training
Training Centre
FC Augsburg Training
Hybrid Turf Pitch
Kieler SV Holstein Stadium
Holstein Stadion
1. FSV Mainz 05 Stadium
MEWA-Arena
VfL Wolfsburg Training
Hybrid Turf Pitch
1. FC Köln Training
Hybrid Turf Pitch
1. FC Cologne Stadium
Franz-Kremer-Stadion
Spvgg. Greuther Fürth Training
Training Centre